EVB Equipamentos de boxe e fitness
Commercial heavy bag rail systems · For brands, distributors & equipment suppliers

Commercial Heavy Bag Rail & Track Systems

Move heavy bags between planned training positions and a defined parking route, so the same floor can support boxing, combat fitness, open-mat work or conditioning at different times.

Q235 steel documented
Modular route planning
Powder-coated finish documented
Complete 3D, side elevation, and top-view display of commercial heavy bag track rail rig system

Commercial rail visualization. Complete 3D, side elevation, and top-view route layout engineered and verified against approved project drawings.

What is a commercial heavy bag rail system?

A commercial heavy bag rail system is a project-specific steel track that allows hanging bags to be moved between defined workout stations and a planned parking area. EVB can review ceiling-mounted, suspended, floor-supported and wall-mounted directions against the room plan, supporting structure, bag selection and required clearances.

4 Configuration Directions for Commercial Venues

These are configuration directions, not universal kits. Final supports, connections, route geometry and station loads are confirmed on the approved project drawing.

Overhead Ceiling or Suspended Track

Considered for ceiling-mounted or suspended routes where the verified overhead structure and installation access can support the layout. It keeps the central floor free of support columns, subject to site-specific structural review.

Floor-Supported Rail System

Uses planned columns and base locations for a floor-supported direction. Column positions, floor anchors and circulation clearances are confirmed for the actual site.

Wall-Mounted Track

Considered for suitable walls and layouts where the route follows the room perimeter. Wall capacity, rail position, reach, working positions and parking positions require project confirmation.

Integrated Training-Zone Layout

A modular rail can be reviewed alongside cage panels or conditioning functions where the project scope calls for an integrated training zone. Each interface remains subject to the approved configuration and supply boundary.

Commercial Rail System Specification Framework

Engineering itemDocumented EVB capabilityConfirmed for the actual project
Structural steelQ235 steel is documented in EVB technical material.Section size, thickness, connections and any substitutions are confirmed on the project drawing and quotation.
Surface finishPowder-coated steel finish is documented.Color, finish system and project environment are confirmed before production.
Trolley functionThe documented trolley provides lock and unlock functions for repositioning the bag.Trolley selection, locking arrangement, suspension and filled bag data are confirmed per project.
Route planningModular track and multiple support directions are documented.Straight sections, turns, end points and parking path are approved for the room plan.
Bag stationsWorking positions can be planned along the route.Station count, spacing, hanging height and clearances are project inputs—not universal published values.
Site structureCeiling, suspended, floor-supported and wall-mounted directions can be reviewed.A qualified local party must verify the receiving structure, anchors and site conditions.
Supply and installationModular and flat-packed supply is documented.Packing, installation scope, local work and responsibilities are stated in the written quotation.

Project Drawings Before Production

EVB uses its DrawHub workflow to turn the buyer’s available venue information into a reviewable configuration direction. Drawing content and turnaround are confirmed with the project scope rather than promised as a universal deadline.

1. Send the available plan

Share the available dimensioned room plan, supporting-structure information, bag count, hanging height, preferred working positions and proposed parking area.

2. Review the route

EVB reviews the track direction, support interfaces, station spacing, circulation, bag data and remaining information needed for quotation.

3. Approve the project basis

The written proposal records the agreed drawing deliverables, rail route, support assumptions, equipment scope, packaging and responsibility boundaries before production.
evb curved heavy bag rail

Built for Brands, Distributors and Equipment Suppliers

EVB manufactures and configures the rail equipment scope so brands, distributors and equipment suppliers can deliver their own downstream gym projects. Final private-label details, finish, documentation, packaging and supply boundaries are defined in the written quotation.

Private-label requirements

Branding requirements are reviewed against the selected components and recorded in the written quotation.

Finish and color

A powder-coated steel finish is documented. Final color and finish requirements are confirmed before production.

Project documentation

The drawing package, packing plan, installation scope and supply boundaries are confirmed for each project.

Direct Answers for Project Planning

Que estrutura é necessária para um sistema de calhas suspensas para sacos de boxe?

Não existe uma resposta universal. É necessário identificar e verificar as condições do betão de apoio, do aço estrutural, das vigas ou de outros elementos de suporte ao longo do percurso proposto. Nos casos em que o suporte suspenso não seja adequado, pode ser considerada uma orientação com suporte no pavimento. A verificação da estrutura do edifício e das fixações continua a ser da responsabilidade de um profissional local qualificado.

Qual é a capacidade de carga de cada carrinho ferroviário?

A EVB não publica um valor de carga nominal único para cada projeto. O carro, a suspensão, o peso do saco cheio, a utilização dinâmica, o espaçamento entre os suportes e a estrutura de receção aplicáveis devem ser confirmados em conjunto no desenho do projeto aprovado e na cotação por escrito.

A pista pode acompanhar as curvas ou o formato personalizado de uma sala?

O percurso é planeado com base na planta real da sala, em vez de ser selecionado a partir de um esquema universal. As curvas, os pontos finais, os locais de apoio e o percurso de estacionamento só são confirmados após a revisão da geometria e da estrutura.

Como é que os sacos são mantidos na posição correta durante o treino?

A documentação técnica da EVB descreve um carrinho com funções de bloqueio e desbloqueio. O carrinho selecionado, o sistema de bloqueio, as posições de trabalho e os detalhes da suspensão são confirmados para o projeto antes do início da produção.

A EVB oferece serviços de planeamento de layout específicos para cada projeto?

A EVB pode analisar as informações de layout específicas de cada projeto através do seu fluxo de trabalho DrawHub. O pacote de desenhos exato, os dados necessários e o prazo de entrega estão indicados no orçamento por escrito.

Como é que o sistema é preparado para o envio de exportação?

EVB technical material documents modular, flat-packed supply. Section lengths, crates or cartons, component marking, loading plan and installation documents are confirmed according to the approved configuration and shipment requirements.

Request a Project-Specific Rail Quote

Send the project details you have on hand—any open items can be reviewed and confirmed during quotation:

  • Company or brand name and destination market
  • Dimensioned room plan and available supporting information
  • Ceiling, beam, wall or floor-support information
  • Bag models, quantities, filled weights and hanging height
  • Preferred working positions and parking area
  • Finish, documentation requirements and target timeline

MATERIAL DOCUMENTADO E NORMAS DE SEGURANÇA

Materiais de qualidade comercial, testados em projetos a nível mundial

EN ISO 20957-1/2/4 Certified Racks
3.0mm Q235 Structural Steel Track
Project-Specific Trolley Loads and Mounting Details Confirmed with Quotation
✓ CE Certified & EN ISO 20957 Commercial Rig Standard✓ Proprietary Self-Locking Trolley & Brake Mechanism

Ceiling Track Punching Bag Rail System

Links multiple bags on a sliding track so operators can deploy or park stations and convert the room for team classes.

Engineering & Technical Specifications

Material da estruturaHeavy-gauge Q235B structural carbon steel (seamless welding)
Steel Tubing Thickness3.5 mm – 4.0 mm industrial structural wall thickness
Finagem de superfícieElectrostatic double-stage powder coating (anti-corrosion, anti-scratch)
Load / Impact CapacityTested to withstand dynamic impact exceeding 8,000 N / 500 kg static load
Safety & ComplianceCE Certified, complies with EN ISO 20957 commercial fitness standards
Customization (OEM/ODM)0 MOQ custom dimensions, RAL powder colors, UV laser printed branding
Packaging StandardReinforced export-grade plywood crates with custom internal foam cradles